欧美一级高清免费a-欧美一级高清片欧美国产欧美-欧美一级高清片在线-欧美一级高清视频在线播放-欧美一级高清在线观看-欧美一级黄色录像

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 日韩欧美在线观看视频 | 天天操天天做 | 手机在线看片国产日韩生活片 | 日韩专区视频 | 草b视频在线观看 | 亚洲欧美精品伊人久久 | 免费视频网站一级人爱视频 | 欧美一级美片在线观看免费 | 91在线手机精品免费观看 | 亚洲天堂免费在线 | 中文字幕在线免费观看视频 | 国产5g影院天天爽5g视频在线 | 久久久免费观看 | 亚洲手机看片 | 亚洲在线视频一区 | 曰韩毛片 | 黑人一级毛片 | 久久香蕉综合精品国产 | 日本一级爽毛片在线看 | 欧美一级成人毛片视频 | 99久久久国产精品免费播放器 | 综合精品一区 | 黄网站在线播放视频免费观看 | 国产美女主播一级成人毛片 | 草草草草视频 | 国产v综合v亚洲欧美 | 狠狠色综合网站久久久久久久 | 在线国产一区二区三区 | 免费日批视频软件 | 曰批免费视频播放日本 | 国产人妖另类专区 | 国产精品亚洲精品一区二区三区 | 精品国产福利在线观看网址2022 | 美女破处在线观看 | 中文字幕第二一区 | 天天干天天干天天干天天干天天干 | 黄色成人短视频 | 精品一区二区视频 | 91黄瓜| 优物传媒网站 | 久久久久国产一级毛片高清片 |